Search
Close this search box.
Search
Close this search box.
  1. Tomorrow, Friday, they will be digging up the sewer line which exists under a portion of the main drive leading from Dixie Highway back to all buildings behind the Schubert Building. The location of the digging will be directly in front of the construction entrance to The Residences on our driveway. Traffic flow will be redirected around the digging that will be occurring. They hope to have this work completed by end of business on Friday.
  2. The temporary entrance to the Schubert Building which is located on the south side of the building will be blocked off Saturday, Sunday, Monday and POSSIBLY Tuesday. All foot traffic will be redirected to the ADA entrance at the back of the Schubert Building. We ask people to not cut across the playground to get to this entrance. In fact, the gate on the south side of the playground will be padlocked. Foot traffic will be redirected outside of the playground fence on the pavement to the gate located on the north side (Poverello side) of the playground. The reason that we are redirecting foot traffic outside of the playground is because the mulch in the playground is soft and not optimal for high heels, people with canes or walkers, etc.

 

Robert Boo, CEO

Stay in the loop